⟹ PORTFOLIO — SIMULATION

Conveyor Synchronization Multi-Axis Belt Control

Real-time synchronization of multiple conveyor belts using master-slave logic. Speed ratio, tension control, and soft re-synchronization.

Master/Slave Servo PLC Designer Lenze i750 L_TS2P_ElectronicGearboxBase Lenze c520
CONVEYOR SYNC / MASTER-SLAVE v1.0 | Belt Synchronization Controller
● RUNNING
▸ BELT-1 (MASTER)
V 120 mm/s
▸ BELT-2 (SLAVE-1)
V 120 mm/s
▸ BELT-3 (SLAVE-2)
V 120 mm/s
▸ SYNC
RATIO 1.00 x
ERROR 0.0 mm/s
STATUS SYNC
▸ PRODUCTION
OUTPUT 0
TENSION 50 N
▸ AXES
BELT-1 OK
BELT-2 OK
BELT-3 OK
MASTER SPD 120 mm/s
RATIO 1.00 x
MODE:
MC_GearIn · Master-Slave Sync

What Does It Do?

  • Transmits master belt speed instantly to slave axis
  • Configurable speed ratio enables differential belt speeds
  • PID tension controller maintains belt tension
  • Soft re-sync after fault prevents abrupt stops

How Does It Work?

  • CODESYS MC_GearIn block for electronic gear synchronization
  • Master encoder value forwarded to slave at 1ms cycle over EtherCAT
  • Tension sensor fed into PID feedback loop
  • Lenze i950 CiA402 profile mode for position/velocity control

Industrial Use Cases

  • ⟹ Food packaging & sorting lines
  • ⟹ Paper & cardboard manufacturing lines
  • ⟹ Textile weaving & dyeing machines
  • ⟹ Automotive assembly conveyors
  • ⟹ Logistics distribution systems

// Manual Synchronization vs. Servo Synchronization

Criterion ❌ Manual / Mechanical ✅ Servo Sync
Speed accuracy ±5% ±0.1%
Start-up time 5–10 sec <0.5 sec
Product slip High Zero
Tension control Manual Automatic PID
Fault recovery Full stop Soft re-sync

// Typical Application Parameters

Parameter Value Unit / Note
Master speed (max) 300 mm/s
Speed ratio 0.1 – 5.0 x
Sync accuracy ±0.1 %
Tension (nominal) 50 N
EtherCAT cycle 1 ms
Servo drive Lenze i750 2-axis
Controller Lenze c520 Motion PLC
Software PLC Designer L_TS2P_ElectronicGearboxBase

// Cycle Phases

START

Master motor ramps to target speed

SYNC

Slave belts lock to master speed

RUN

Synchronized production, error monitoring active

TENSION

PID dancer arm tension control

CORRECT

Speed correction applied if slip detected